Proces verbal la terminarea lucrarilor

Data: 3 noiembrie 2011   Ora: 09:52

PROCES VERBAL

DE RECEPTIE LA TERMINAREA LUCRARILOR

Nr. _______________ / ________________

 

Privind lucrarea _________________________________________________

Avand Sc = ____________ mp, situata in str. ______________________ nr._______

Executata in cadrul contractului nr. _____________________________ incheiat intre

_____________________________________ si intre _________________________

pentru lucrarile de ______________________________________________________

I. Lucrarile au fost executate in baza autorizatiei de construire nr. __________

_________________liberata de Consiliul Local, cu valabilitate pana la ___________

II. Comisia de receptie si-a desfasurat activitatea in intervalul _____________

Fiind formata din:

1. Investitor __________________________ 4. Specialist _____________________

2. Reprez.C.L. ________________________ 5. Specialist _____________________

3. Specialist __________________________ 6. Specialist _____________________

7. Specialist _____________________

III. Au mai participat la receptie:

IV. Comisia de receptie in urma constatarilor facute, propune:

_____________________________________________________________________

_____________________________________________________________________

V. Valoarea lucrarilor de construire s-a ridicat la suma de lei______________

_____________________________________________________________________

VI. Prezentul proces – verbal, continand _________ file si __________ anexe

Numerotate cu un total de _______ file, a fost incheiat astazi____________________

In ______________ exemplare.

 

COMISIA DE RECEPTIE                                               SEMNATURA

 

1. Investitor __________________________________________________________

2. Reprezentantul Consiliului Local _______________________________________

3. Specialist _________________________________________________________

4. Specialist _________________________________________________________

5. Specialist _________________________________________________________

6. Specialist _________________________________________________________

7. Specialist _________________________________________________________

 

Descarca Proces verbal de receptie la terminarea lucrarilor.doc

   
  • Credite


    Compara »
  • Depozite la Termen


    Compara »



    Stiri ultima ora

Brexit: Vodafone vrea sa-si mute sediul central din Londra

Compania britanica Vodafone, al doilea mare operator de telefonie mobila din lume, care are operatiuni si in Romania, se alatura firmelor care si-a... citeste mai mult

Curs valutar: Zi fara emotii pentru leu

Euro a stagnat, miercuri, iar dolarul si lira sterlina au crescut putin. Banca Nationala a Romaniei (BNR) a cotat moneda europeana la 4,5220 lei/... citeste mai mult

Ministerul Energiei: Gazele nu se scumpesc de la 1 iulie

Ministrul Energiei, Victor Grigorescu, a anuntat, marti, ca nu va exista o scumpire a gazelor la 1 iulie pentru populatie, asa cum era prevazut ant... citeste mai mult