Proces verbal la terminarea lucrarilor

Data: 3 noiembrie 2011   Ora: 09:52

PROCES VERBAL

DE RECEPTIE LA TERMINAREA LUCRARILOR

Nr. _______________ / ________________

 

Privind lucrarea _________________________________________________

Avand Sc = ____________ mp, situata in str. ______________________ nr._______

Executata in cadrul contractului nr. _____________________________ incheiat intre

_____________________________________ si intre _________________________

pentru lucrarile de ______________________________________________________

I. Lucrarile au fost executate in baza autorizatiei de construire nr. __________

_________________liberata de Consiliul Local, cu valabilitate pana la ___________

II. Comisia de receptie si-a desfasurat activitatea in intervalul _____________

Fiind formata din:

1. Investitor __________________________ 4. Specialist _____________________

2. Reprez.C.L. ________________________ 5. Specialist _____________________

3. Specialist __________________________ 6. Specialist _____________________

7. Specialist _____________________

III. Au mai participat la receptie:

IV. Comisia de receptie in urma constatarilor facute, propune:

_____________________________________________________________________

_____________________________________________________________________

V. Valoarea lucrarilor de construire s-a ridicat la suma de lei______________

_____________________________________________________________________

VI. Prezentul proces – verbal, continand _________ file si __________ anexe

Numerotate cu un total de _______ file, a fost incheiat astazi____________________

In ______________ exemplare.

 

COMISIA DE RECEPTIE                                               SEMNATURA

 

1. Investitor __________________________________________________________

2. Reprezentantul Consiliului Local _______________________________________

3. Specialist _________________________________________________________

4. Specialist _________________________________________________________

5. Specialist _________________________________________________________

6. Specialist _________________________________________________________

7. Specialist _________________________________________________________

 

Descarca Proces verbal de receptie la terminarea lucrarilor.doc

   
  • Credite


    Compara »
  • Depozite la Termen


    Compara »



    Stiri ultima ora

Europa de Est tremura de teama ca Rusia ar putea inchide robinetul la iarna - Bloomberg

Iarna bate la usa, iar natiunile care au fost in sfera de influenta sovietica, de la Polonia la Bulgaria, privesc cu sufletul la gura negocierile i... citeste mai mult

Bloomberg: Pretul mic al terenurilor agricole atrage investitorii in Romania

Investitorii straini sunt atrasi de terenurile agricole din Romania deoarece acestea costa mult mai putin decat in Germania sau in Marea Britanie. ... citeste mai mult

Basescu: Niciun metru cub de gaz romanesc nu va tranzita South Stream. Avem resurse

Presedintele Traian Basescu a declarat, vineri, dupa Consiliul European, ca "niciun gram, niciun metru cub de gaz romanesc" nu va tranzita proiectu... citeste mai mult